Megatec
Megatec fuel dispenser at a Nigerian filling station

Reliable fuel dispensers for Nigerian filling stations

Supply, installation, calibration and after-sales support. Assembled and tested in Nigeria. SON-certified. Available nationwide.

SON-Certified & NMDPRA-Compliant Installations

1,500+ Stations Equipped Nationwide

Calibration-Certified Technicians

Assembled & Tested in Nigeria, Spare Parts Always Available

Best selling dispensers

Our most trusted units for Nigerian filling stations and depots — tried, tested and NMDPRA-certified.

MT PLUS – Single Nozzle (TB)

MT PLUS – Single Nozzle (TB)

  • Flow rate: 5–50 L/min · ±0.3% accuracy
  • Bennett meter · Tokheim unit
  • Single nozzle · PMS, AGO or DPK
MT PRO – Double Nozzle (TB-D1)

MT PRO – Double Nozzle (TB-D1)

  • Flow rate: 5–50 L/min · ±0.3% accuracy
  • Bennett meter · Tokheim unit
  • Serves two vehicles · PMS, AGO or DPK
MT PRO – Single Nozzle (TT)

MT PRO – Single Nozzle (TT)

  • Flow rate: 5–50 L/min · ±0.3% accuracy
  • Tokheim meter & unit
  • Single nozzle · PMS, AGO or DPK
MT PLUS – Single Nozzle (BB)

MT PLUS – Single Nozzle (BB)

  • Flow rate: 5–50 L/min · ±0.3% accuracy
  • Bennett meter & unit
  • 7-yr memory · 10-min backup
MT PLUS SUBMERSIBLE – Dual Nozzle

MT PLUS SUBMERSIBLE – Dual Nozzle

  • For submersible (STP) systems · ±0.3% accuracy
  • Bennett meter · solenoid valve · CPU control
  • Dual nozzle · PMS, AGO or DPK
GEAR PUMP – Single Nozzle

GEAR PUMP – Single Nozzle

  • High flow rate: 5–100 L/min · ±0.3% accuracy
  • Self-priming gear pump · oil separator
  • Single nozzle · built for depots

A poorly calibrated dispenser costs your station money every single day

Meter inaccuracy is revenue leaking out of your tanks. Even a 2% meter error on a busy station represents significant daily loss — multiplied across every nozzle, every shift. Beyond lost revenue, NMDPRA sanctions for non-compliant equipment can escalate to licence review — a threat no station owner can afford to ignore.

— “Mega Tec's calibration service ensures every litre dispensed is accounted for — protecting your revenue and your licence.”

Our installation process

1

Site assessment & equipment recommendation

We evaluate your site before any equipment decision is made.

2

Supply & professional installation

Certified technicians, industry-standard practices throughout.

3

Calibration, testing & commissioning

Full meter calibration and NMDPRA sign-off on completion.

Download product specifications

Download the full technical datasheet for our fuel dispenser range.

Download product specs

Our portfolio

Real world projects

300+ dispensers and 30 LPG units supplied across repeat contracts, delivering smoother operations and reduced downtime across their stations.

Nepal Energies, Nationwide

24/7 technical assistance and proactive system monitoring ensure smooth operations and immediate troubleshooting.

An electric charging station in Abuja

Dispenser supply with professionally handled installation and calibration, operating efficiently since commissioning.

Sterling Oil & Gas, Lagos, Akwa Ibom & PH

Get in touch with us

HEAD OFFICE: 9E LSDPC, Apapa-Oshodi Expressway, (by Jakande bus stop) Mile 2, Lagos, Nigeria.

Megatec head office location map
9E LSDPC, Apapa-Oshodi Expressway, Lagos